Bunn COMBO BREWER Service Manual

Browse online or download Service Manual for Coffee makers Bunn COMBO BREWER. Bunn COMBO BREWER Service manual User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 23
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
Smart Wave Series
Smart Wave Silver Series
Series
®
INSTALLATION & OPERATING GUIDE
BUNN-O-MATIC CORPORATION
POST OFFICE BOX 3227
SPRINGFIELD, ILLINOIS 62708-3227
PHONE: (217) 529-6601 FAX: (217) 529-6644
To ensure you have the latest revision of the Operating Manual, or to view the Illustrated Parts
Catalog, Programming Manual, or Service Manual, please visit the Bunn-O-Matic website, at
www.bunn.com. This is absolutely FREE, and the quickest way to obtain the latest catalog and
manual updates. For Technical Service, contact Bunn-O-Matic Corporation at 1-800-286-6070.
40410.0000H 03/14 ©2007 Bunn-O-Matic Corporation
Combo Coffee/Tea Brewer
Page view 0
1 2 3 4 5 6 ... 22 23

Summary of Contents

Page 1 - BUNN-O-MATIC CORPORATION

Smart Wave SeriesSmart Wave Silver SeriesSeries®INSTALLATION & OPERATING GUIDEBUNN-O-MATIC CORPORATIONPOST OFFICE BOX 3227SPRINGFIELD, ILLINOIS 62

Page 2 - 40410 031314

Page 1040410 092407PROGRAMMING - SILVER SERIESBREW VOLUME SET-UP:NOTE: Set small and large batches separately. Maximum water on time is 5 minutes.Use

Page 3 - USER NOTICES

Page 11B CA(A) ENABLE BREW ON/OFF SWITCHPressing the "ENABLE BREW ON/OFF" switch (indicator/display on) enables the brew circuit, and the ta

Page 4 - CE REQUIREMENTS

Page 1240410 092211PROGRAMMING - SMART WAVE WITH DISPLAYBREW VOLUME SET-UP:NOTE: Maximum water on time is 5 minutes.1. Press the "HIDDEN"

Page 5 - PLUMBING REQUIREMENTS

Page 1340410 012814PROGRAMMING - SMART WAVE COMBOBREW VOLUME SET-UP:NOTE: Maximum water on time is 5 minutes.1. Press the "HIDDEN" switch

Page 6 - INITIAL SET UP

Page 14Remove sprayhead by turning counterclockwiseDELIMINGBunn-O-Matic recommends deliming your coffee brewer periodically. The actual frequency of

Page 7 - COFFEE BREWING

Page 15FIG 15BFIG 15ACLEANINGThe use of a damp cloth rinsed in any mild, non-abrasive, liquid detergent is recommended for cleaning all surfaces on Bu

Page 8 - TEA BREWING

Page 16COVER REMOVALUnplug the brewer and let it cool down before proceeding.Front Wrap:1. Remove the brew funnel.2. Remove upper and lower screws o

Page 9 - Smart Wave Silver Series

Page 17DRAINING TANK1. Unplug the brewer and let it cool down before proceeding.2. Remove the brew funnel.3. Remove the front cover.4. Pinch fill h

Page 10 - PROGRAMMING - SILVER SERIES

Page 181 2 3 4OFFONFIG 18BSWITCH SETTINGSProgram Switches:1. Unplug the brewer and let it cool down before proceeding.3. Remove the left rear cover.

Page 11 - Smart Wave Series

Page 19TROUBLESHOOTING40410 092407RED LED FLASHES DISPLAY DESCRIPTION ACTION 1. ER 1 TEMP SENSOR SHORTED CALL SERVICE 2. ER 2 T

Page 12 - 40410 092211

Page 240410 031314BUNN-O-MATIC COMMERCIAL PRODUCT WARRANTYBunn-O-Matic Corp. (“BUNN”) warrants equipment manufactured by it as follows:1) Airpots, th

Page 13 - 40410 012814

Page 20-SCHEMATIC WIRING DIAGRAMWAVE 15 APS, 15 S APS40405.0001A 02/08 ©2008 BUNN-O-MATIC CORPORATIONTANK HEATERLIMITTHERMOSTATVENT VALVE SOLENO

Page 14 - DELIMING

Page 21SCHEMATIC WIRING DIAGRAMWAVE 120/240V APS SERIES40405.0002A 02/08 ©2008 BUNN-O-MATIC CORPORATION120/240V AC3 WIRE + GNDSINGLE PHASEChassi

Page 15 - CLEANING

Page 22-SCHEMATIC WIRING DIAGRAMWAVE 15 APS, 15 S APS40405.0003A 04/10 ©2010 BUNN-O-MATIC CORPORATIONTANK HEATERLIMITTHERMOSTATVENT VALVE SOLENO

Page 16 - COVER REMOVAL

Page 23-SCHEMATIC WIRING DIAGRAMWAVE 15 COFFEE TEA COMBO40405.0004B 03/14 ©2013 BUNN-O-MATIC CORPORATIONTANK HEATERLIMITTHERMOSTATVENT VALVE SOL

Page 17 - DRAINING TANK

Page 3CONTENTSWarranty ...2Introduction ...

Page 18 - SWITCH SETTINGS

Page 4ELECTRICAL REQUIREMENTSCAUTION - The brewer must be disconnected from the power source until specified in Initial Set-Up.Refer to Data Plate on t

Page 19 - TROUBLESHOOTING

Page 5PLUMBING REQUIREMENTSThese brewers must be connected to a cold water system with operating pressure between 20 and 90 psi (0.138 and 0.620 MPa)

Page 20 - WAVE 15 APS, 15 S APS

Page 6INITIAL SET UPCAUTION - The brewer must be disconnected from the power source throughout the initial set-up, except when specified in the instruc

Page 21 - WAVE 120/240V APS SERIES

Page 7COFFEE BREWING1. Begin each brew cycle with a clean empty brew funnel. 2. Insert a BUNN filter into the funnel. (FIG 7A)3. Pour (or grind) fr

Page 22

Page 8TEA BREWING1. Begin each brew cycle with a clean empty tea funnel. 2. Insert a BUNN filter into the tea funnel (FIG 8A).3. Pour fresh tea int

Page 23 - WAVE 15 COFFEE TEA COMBO

Page 9OPERATING CONTROLS - SILVER SERIES(A) ENABLE BREW ON/OFF SWITCHPressing the "ENABLE BREW ON/OFF" switch (indicator on) enables the bre

Comments to this Manuals

No comments