IC3 & IC3BONHALFOFFFULL STARTREADYONHALFOFFFULL START READYINSTALLATION & OPERATING GUIDEBUNN-O-MATIC CORPORATIONPOST OFFICE BOX 3227SPRINGFIE
Page 210792 080112BUNN-O-MATIC COMMERCIAL PRODUCT WARRANTYBunn-O-Matic Corp. (“BUNN”) warrants equipment manufactured by it as follows:1) Airpots, the
Page 3INTRODUCTION This equipment will brew a batch of fresh coffee into an awaiting vessel and dispense at approximately room tempera-ture to conser
Page 4Electrical Hook-UpCAUTION – Improper electrical installation will damage electronic components.1. An electrician must provide electrical servic
Page 5PLUMBING REQUIREMENTS This brewer must be connected to a cold water system with operating pressure between 30 (207 kPa) and 90 psi (620 kPa) fr
Page 610792 050405INITIAL SET-UP1. Remove the top lid from the brewer.2. Rotate the control thermostat knob fully counterclockwise to the “OFF” posi
Page 7ADJUSTING BREW VOLUMESCAUTION - Disconnect the power source from the brewer prior to the removal of any panel for the replacement or adjustment
Page 810792 072408OPERATING CONTROLSA. Lighted On/Off Switch ON - Placing the switch in the lighted upper position allows the start switch to activa
Page 9FULL/HALF SW42READY INDICATORSW. & THERMOSTATSCHEMATIC WIRING DIAGRAM IC3BLKBLKGRNTANK HEATERRED10793.0000B 01/07©1994 BUNN-O-MATIC COR
Comments to this Manuals