Bunn ICBB Repair Manual

Browse online or download Repair Manual for Coffee makers Bunn ICBB. Bunn ICBB Repair manual User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 30
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
SERVICE & REPAIR MANUAL
BUNN-O-MATIC CORPORATION
POST OFFICE BOX 3227
SPRINGFIELD, ILLINOIS 62708-3227
PHONE: (217) 529-6601 FAX: (217) 529-6644
42461.0000A 01/10 ©2010 Bunn-O-Matic Corporation
ITB/ITCB
ICB/TWIN
Infusion Series
®
Page view 0
1 2 3 4 5 6 ... 29 30

Summary of Contents

Page 1 - ICB/TWIN

SERVICE & REPAIR MANUALBUNN-O-MATIC CORPORATIONPOST OFFICE BOX 3227SPRINGFIELD, ILLINOIS 62708-3227PHONE: (217) 529-6601 FAX: (217) 529-6644424

Page 2 - 42461 110909

10COMPONENT ACCESS This section provides procedures for testing and replacing various major components used in this brewer should service become nece

Page 3 - CONTENTS

11Location: The Control Board is located inside the top cover behind the front face plate.Test Procedures: The test procedures for the control boar

Page 4 - TROUBLESHOOTING

12Location:The Membrane Switch is located on the front face plate.Test Procedures: There are two methods for testing the membrane switch. The easiest

Page 5

13Location:The brew valve is located inside the top cover behind the front face plate.Test Procedures:1. Refer to the Programing Section for Service

Page 6

14Location:The brew valve is located inside the top cover behind the front face plate.Test Procedures:1. Refer to the Programing Section for Service

Page 7

15REFILL VALVESLocation: The refi ll valve is located inside the front of the brewer.Test Procedures:1. Enter programming level 2, scroll to "

Page 8

16REFILL VALVESEARLY ICB CURRENT ICB & & ITBEARLY ITCB CURRENT ITCB & ITB-DDSCREENSTRAINERSCREENSTRAINER42461 0911809Flow control used on

Page 9 - DIAGNOSTICS

17FIG. 17-2 DV TANK HEATERSLocation:The tank heaters are located inside the tank and secured to the tank bottom.Test Procedures:1. With a voltmeter,

Page 10 - 42461 0911809

18LIMIT THERMOSTATLocation:The limit thermostat is located on the tank lid (on the front of the tank on twins).Test Procedures:1. Disconnect the brew

Page 11

19Location: The temperature probe is inserted through the tank lid assembly.Test Procedures:1. Disconnect the brewer from the power source.2. With

Page 12

242461 110909BUNN-O-MATIC COMMERCIAL PRODUCT WARRANTYBunn-O-Matic Corp. (“BUNN”) warrants equipment manufactured by it as follows:1) All equipment oth

Page 13

20TEMPERATURE PROBERemoval and Replacement:1. Disconnect the brewer from the power source.2. Disconnect the two pin connector from J9 on control boa

Page 14

21Location: The voltage selector switch is located on the component mounting bracket on the base plate.Test Procedure:1. Disconnect the brewer from

Page 15

22POWER SWITCHFIG. 22-1 POWER SWITCH (ICB SHOWN)Location: The power switch is located on the lower right side of the trunk (ICB) or lower rear pane

Page 16

23MEMORY BOARD SCHEMATIC WIRING DIAGRAM iTCBA, iTCBB 36460.0001C 08/09 ©2004 BUNN-O-MATIC CORPORATIONBLU-14 BLU-14 LIMIT THERMOSTAT RED RED WHI

Page 17

24BRN/WHIOPTIONALSWEETENERKITSOLMEMORYBOARDSCHEMATIC WIRING DIAGRAMITCB-DV & ITCB-C-DV36460.0003A 06/08 ©2008 BUNN-O-MATIC CORPORATIONBLU-14

Page 18

25BRN/WHISOLSCHEMATIC WIRING DIAGRAMITCB-DV & ITCB-C-DVWITH FACTORY SWEETENER36460.0004A 10/08 ©2008 BUNN-O-MATIC CORPORATIONBLU-14BLU-14LIM

Page 19

26MEMORYBOARDSCHEMATIC WIRING DIAGRAM ICB-DV37299.0000B 02/07 ©2004 BUNN-O-MATIC CORPORATIONBLU-14BLU-14LIMITTHERMOSTATWHIWHIWHI/REDWHI/VIOWHI/R

Page 20 - 200° CAL 200°

27MEMORYBOARDSCHEMATIC WIRING DIAGRAM ICB TWIN37299.0001C 02/07 ©2005 BUNN-O-MATIC CORPORATIONBLU-14BLU-14LIMITTHERMOSTATWHIWHIWHI/REDWHI/YELWHI

Page 21

28MEMORY BOARD SCHEMATIC WIRING DIAGRAM iCBA, iCBB 37299.0002B 08/09 ©2005 BUNN-O-MATIC CORPORATIONBLU-14 BLU-14 LIMIT THERMOSTAT RED RED WHI/R

Page 22

29MEMORYBOARDSCHEMATIC WIRING DIAGRAM ICB TWIN 230V37299.0004A 12/08 ©2008 BUNN-O-MATIC CORPORATIONBLU-14BLU-14LIMITTHERMOSTATREDREDWHI/REDWHI/Y

Page 23 - SINGLE PHASE

3INTRODUCTIONThis equipment will brew a half-gallon batch of coffee into an awaiting dispenser. It can be easily confi gured for 120V 15 amp, 120/208V

Page 24 - ITCB-DV & ITCB-C-DV

3042461 0911809SCHEMATIC WIRING DIAGRAM ITBSINGLE & DUAL DILUTION MODELSAND MODELS w/OPTIONAL SWEETENER42377.0000B 12/09 ©2009 BUNN-O-MATIC

Page 25 - WITH FACTORY SWEETENER

4TROUBLESHOOTINGA troubleshooting guide is provided to suggest probable causes and remedies for the most likely problems encountered. If the problem

Page 26 - 120/240V AC 3 WIRE

5Will not refi llRefi ll does not shut offPower "ON"Refi ll does not shut offPower "OFF"PROBABLE CAUSE REMEDYPROBLEM1. Power off to b

Page 27 - 3 WIRE + GND

6HEATING CIRCUIT1. Display's error message2. Water not touching main (short) level probe3. Water Level Probe Sensing System4. Temperature Probe5.

Page 28

7TROUBLESHOOTING (cont.)PROBLEMPROBABLE CAUSE REMEDYBREWING CIRCUITBrew cycle will not startConsistently low beverage level in the dispenser or bevera

Page 29 - 2 WIRE + GND

8TROUBLESHOOTING (cont.)PROBLEM PROBABLE CAUSE REMEDYBREWING CIRCUIT (cont.)Dripping from sprayheadWeak beverageDry coffee grounds remain in the funne

Page 30 - SCHEMATIC WIRING DIAGRAM ITB

9DIAGNOSTICSPROBABLE CAUSE REMEDYMESSAGETemperature Too LowHeating Time Too LongFill Time Too LongTemp Sensor Out Of Range, Check For Bad ConnectionsT

Comments to this Manuals

No comments