OPERATING & INSTALLATION MANUALBUNN-O-MATIC CORPORATION POST OFFICE BOX 3227SPRINGFIELD, ILLINOIS 62708-3227PHONE: (217) 529-6601 FAX: (217) 52
Page 240305 021513BUNN-O-MATIC COMMERCIAL PRODUCT WARRANTYBunn-O-Matic Corp. (“BUNN”) warrants equipment manufactured by it as follows:1) Airpots, th
Page 3USER NOTICESCarefully read and follow all notices in this manual and on the equipment. All labels on the equipment should be kept in good condi
Page 4ELECTRICAL REQUIREMENTSCAUTION - The brewer must be disconnected from the power source until specifi ed in Initial Set-Up.All models have an atta
Page 5COFFEE BREWING1. Insert a BUNN® fi lter into the funnel.2. Pour the fresh coffee into the fi lter and level the bed of grounds by gently shaking
Page 6TROUBLESHOOTINGA troubleshooting guide is provided to suggest probable causes and remedies for the most likely problems encountered. If the pro
Page 71117783916641514513101219212120252422231840305 040307
Page 8 1 20583.0010 1 Funnel Assembly w/Decals 2 04238.0000 1 Pitcher 3 01188.0000 1 Deliming Spring 4 28319.0000 1 Thermostat 07073.1000 1
Page 9LIMITTHERMOSTATL1BLKBRNBRNSCHEMATIC WIRING DIAGRAM 392GRN/YELBLUADJUSTABLE THERMOSTATN120 VOLTS A C 2 WIRESINGLE PHASE60 HZ39943.0000C 11/12
Comments to this Manuals