Bunn T3 Service Manual Page 19

  • Download
  • Add to my manuals
  • Print
  • Page
    / 59
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 18
Page 19
SERVICE (cont.)
TANK HEATER SWITCH (cont.)
FIG. 19-1 TANK HEATER SWITCH TERMINALS
15. Set tank assembly inside the hood on mounting
brackets and secure with two #8-32 screws.
16. Reconnect the wires to the limit thermostat, tank
heater and the control thermostat. Refer to limit
thermostat, tank heater and control thermostat sec-
tions in this manual when reconnecting wires.
17. Brewers with faucet reinstall the faucet tube and
reconnect the water supply tube to the coil as-
sembly.
18. Secure the sprayhead tube to the hood using hex
nut.
19. Install sprayhead.
20. Install fi ll basin, inlet gasket and secure to tank lid
with tank inlet fi tting.
21. Carefully install water fi ll tube into the back of
the fi ll basin.
22. Reconnect and turn on the incoming water sup-
ply.
23. Refer to Fig. 15 when reconnecting the wires.
BLK to Limit Thermostat
BLK to Terminal Block
(Black Insert)
41711.1 052009
Page view 18
1 2 ... 14 15 16 17 18 19 20 21 22 23 24 ... 58 59

Comments to this Manuals

No comments