Bunn JDF-2 Service Manual Page 8

  • Download
  • Add to my manuals
  • Print
  • Page
    / 28
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 7
8
PRIMING
1. Open the dispenser door
2. Load concentrate per instructions in section titled Loading.
3. Close the dispenser door.
4. Place a large container under the appropriate dispense nozzle.
Press and hold the “Product Dispense Switch” Fig 5, until concentrate dispenses from the dispense nozzle.
Note: This may take several seconds, depending on the installation and set pump speed.
39992 071108
OPERATING CONTROLS
FIG 7 Refrigeration Switch - JDF-2S
FIG 9 Product Dispense Switches - JDF-2S
Refrigeration Switch
The refrigeration switch is located on the rear of the dispenser near the center. This switch controls power to the
water bath pump and relay contacts for the compressor and condenser fan motor.
P3580-1
Product Dispense Switch (Mechanical Switch Machines)
Pressing and holding switch will initiate product flow from the respective nozzle; releasing the switch will stop
the flow.
P3583
FIG 8 Refrigeration Switch - JDF-4S
FIG 10 Product Dispense Switches - JDF-4S
P3841
P3844
Page view 7
1 2 3 4 5 6 7 8 9 10 11 12 13 ... 27 28

Comments to this Manuals

No comments